A Firm’S Smc Schedule is Shown in the Following Table. the Total Fixed Cost of the Firm is Rs 100/-. Find the Tvc, Tc, Avc and Sac Schedules of the Firm. - Economics

Advertisements
Advertisements

प्रश्न

A firm’s SMC schedule is shown in the following table. The total fixed cost of the firm is Rs 100/-. Find the TVC, TC, AVC and SAC schedules of the firm.

L

TPL

0

1

500

2

300

3

200

4

300

5

500

6

800

योग

उत्तर

Q

(units)

SMC

(Rs)

TFC = Rs 100

(Rs)

TVCn = SMCn + TVCn-1

(Rs)

TC = TVC + TFC

(Rs)

`"AVC"="TVC"/Q`

(Rs)

`"SAC"="TC"/Q`

(Rs)

0

100

100

1

500

100

500

500 + 100 = 600

`500/1=500`

`600/1=600`

2

300

100

300 + 500 = 800

800 + 100 = 900

`800/2=400`

`900/2=450`

3

200

100

200 + 800 = 1000

1000 + 100 = 1100

`1000/3=333.33`

`1100/3=366.67`

4

300

100

300 + 1000 = 1300

1300 + 100 = 1400

`1300/4=325`

`1400/4=350`

5

500

100

500 + 1300 = 1800

1800 + 100 = 1900

`1800/5=360`

`1900/5=380`

6

800

100

800 + 1800 = 2600

2600 + 100 = 2700

`2600/6=433.33`

`2700/6=450`

shaalaa.com
Cost - Average Variable Cost
  क्या इस प्रश्न या उत्तर में कोई त्रुटि है?
अध्याय 3: Production And Costs - Exercise [पृष्ठ ५२]

APPEARS IN

एनसीईआरटी Economics - Introductory Microeconomics [English]
अध्याय 3 Production And Costs
Exercise | Q 27 | पृष्ठ ५२