Advertisements
Advertisements
प्रश्न
A firm’s SMC schedule is shown in the following table. The total fixed cost of the firm is Rs 100/-. Find the TVC, TC, AVC and SAC schedules of the firm.
L |
TPL |
0 |
− |
1 |
500 |
2 |
300 |
3 |
200 |
4 |
300 |
5 |
500 |
6 |
800 |
योग
उत्तर
Q (units) |
SMC (Rs) |
TFC = Rs 100 (Rs) |
TVCn = SMCn + TVCn-1 (Rs) |
TC = TVC + TFC (Rs) |
`"AVC"="TVC"/Q` (Rs) |
`"SAC"="TC"/Q` (Rs) |
0 |
− |
100 |
− |
100 |
− |
− |
1 |
500 |
100 |
500 |
500 + 100 = 600 |
`500/1=500` |
`600/1=600` |
2 |
300 |
100 |
300 + 500 = 800 |
800 + 100 = 900 |
`800/2=400` |
`900/2=450` |
3 |
200 |
100 |
200 + 800 = 1000 |
1000 + 100 = 1100 |
`1000/3=333.33` |
`1100/3=366.67` |
4 |
300 |
100 |
300 + 1000 = 1300 |
1300 + 100 = 1400 |
`1300/4=325` |
`1400/4=350` |
5 |
500 |
100 |
500 + 1300 = 1800 |
1800 + 100 = 1900 |
`1800/5=360` |
`1900/5=380` |
6 |
800 |
100 |
800 + 1800 = 2600 |
2600 + 100 = 2700 |
`2600/6=433.33` |
`2700/6=450` |
shaalaa.com
Cost - Average Variable Cost
क्या इस प्रश्न या उत्तर में कोई त्रुटि है?