Advertisements
Advertisements
प्रश्न
Solve the following equation:
14 = 27 - x
उत्तर
14 = 27 - x
⇒ x = 27- 14
⇒ x = 13
∴ x = 13
APPEARS IN
संबंधित प्रश्न
Solve the following equation:
3(x + 1) = 12 + 4(x - 1)
Solve the following equation:
`"x"/3 - 2 1/2 = "4x"/9 - "2x"/3`
Solve the following equation:
x – 5 = 8
Solve: y + 20% of y = 18
Solve: `("y" + 2)/3 + ("y" + 5)/4 = 6`
Solve: 21 – 3 (x – 7) = x + 20
Solve: `(3"x" - 2)/7 - ("x" - 2)/4 = 2`
Find a number whose one-third part exceeds its one-fifth part by 20.
The length of a rectangular plot exceeds its breadth by 5 m. If the perimeter of the plot is 142 m, find the length and the breadth of the plot.
Solve the following equations for the unknown: `(1)/(x - 1) + (4)/(5) = (2)/(3), x ≠ 1`
Solve the following equations for the unknown: `2(1)/(5) - (x - 2)/(3) = (x - 1)/(3)`
If `(2)/"m" xx 1(1)/(5) = (3)/(7) "of" 2(1)/(2)`, find the value of 'm'.
Solve the following equations: a(x - b) -x (x - 2b) = x + 5(x - b)
The measures of angles of a quadrilateral in degrees are x°, (3x-40)°, 2xo and (4x+20)o. Find the measures of the angles.
A takes 4hours more than B in walking 30 km. If A doubles his speed, he will take 1hr less than B. Find the speeds of A and B.
What number increased by 15% of itself gives 2921?
The perimeter of a rectangular field is 100m. If its length is decreased by 2m and breadth increased by 3 m, the area of the field is increased by 44m2. Find the dimensions of the field.
A and B together can complete a piece of work in 4 days, but A alone can do it a in 12 days. How many days would B alone take to do the same work.
What number increased by 8% of itself gives 1620?
In a shooting competition a marks man receives 50 paise if he hits the mark and pays 20 paise if he misses it. He tried 100 shots and was paid Rs 29. How many times did he hit the mark?