Advertisements
Advertisements
प्रश्न
40 men can finish a piece of work in 26 days. How many men will be needed to finish it in 16 days?
उत्तर
Number of men needed to finish a piece of work in 26 days = 40
Number of men needed to finish it in 1 day = 26 × 40 = 1040 (less days means more men)
Number of men needed to finish it in 16 days = `1040/16` = 65
APPEARS IN
संबंधित प्रश्न
A football team won 10 matches out of the total number of matches they played. If their win percentage was 40, then how many matches did they play in all?
A school has 630 students. The ratio of the number of boys to the number of girls is 3 : 2. This ratio changes to 7 : 5 after the admission of 90 new students. Find the number of newly admitted boys.
which of the following ratio is greater?
2 : 3 and 13 : 19
Express the following ratios in its simplest form :
30 cm : 2 m
The ratio between two quantities is 3:4. If the first number is 810, find the second number.
Reduce the following ratio to their lowest term:
4 weeks : 49 days
Find the sub-triplicate ratio of 1 : 216
Fill in the place holder:
The ratio of the pocket money saved by Lokesh and his sister is 5 : 6. If the sister saves Rs 30 more, how much more the brother should save in order to keep the ratio of their savings unchanged?
Ratio of 75 paise to ₹ 2 = _____________