Advertisements
Advertisements
प्रश्न
A takes 10days less than B to Finish a piece of work , If both A and B work together , they can finish the work in 12 days. Find the time taken by B to finish the work.
उत्तर
Let B take 'c' days to finish the work. Hence, A will take 'c - 1 O' days.
⇒ Work done by B in One day = `1/"c"` , whereas work done by A in one day = `(1/("c" - 10))`
⇒ Work done by A and B combined in one day = `1/"c" + 1/("c" - 10) = ("c" - 10 + "c")/("c"^2 - 10"c")`
⇒ c2 - 10c = 24c -120
⇒ c2 -34c + 120 = 0
⇒ c2 -30c - 4c + 120 = 0
⇒ c (c -30) - 4(c - 30) = 0
⇒ (c - 30)(c - 4) = 0.
It can't be 4 as they together complete in 12 days and hence has to be more than that.
Hence no. of days taken by B to finish the work = 30
APPEARS IN
संबंधित प्रश्न
Solve the equation 4x2 – 5x – 3 = 0 and give your answer correct to two decimal places
Find the value of ‘p’, if the following quadratic equation have equal roots:
4x2 – (p – 2)x + 1 = 0
Use the substitution y = 2x + 3 to solve for x, if 4(2x + 3)2 – (2x + 3) – 14 = 0.
`100x^2-20x+1=0`
`3^((x+2))+3^(-x)=10`
Out of a group of Swans, 3 and half times the square root of the total number are playing on the shore of a pond. The two remaining ones are swinging in water. Find the total number of swans.
Solve:
`x/3 + 3/(6 - x) = (2(6 +x))/15; (x ≠ 6)`
Solve:
`(1200/x + 2)(x - 10) - 1200 = 60`
Write the following quadratic equation in standard form ax2 + bx + c = 0 : x (x + 3) = 7
If x2 – 4x – 5 = 0, values of x correct to two decimal places are ______.