Advertisements
Advertisements
प्रश्न
If 12 men and 16 boys can do a piece of work in 5 days and, 13 men and 24 boys can do it in 4 days, how long will 7 men and 10 boys take to do it?
उत्तर
12 men + 16 boys can do a piece of work in = 5 days
60 men + 80 boys can do a piece of work in = 1 day ......…. (i)
and 13 men + 24 boys can do the same work in = 4 days
52 men + 96 boys can do the same work in = 1 day ………….(ii)
From (i) and (ii)
60 men + 80 boys = 52 men + 96 boys
⇒ 60 men – 52 men = 96 boys – 80 boys
⇒ 8 men = 16 boys
1 man =`16/8` = boys
Now, in first case,
12 men + 16 boys = 12 x 2 + 16 = 24+16 = 40 boys
In the second case,
7 men + 10 boys = 7 x 2 + 10 = 14 + 10 = 24 boys
Now 40 boys can do a piece of work in = 5 days
1 boy can do the same work in = 5 x 40 days
and 24 boys will do the same work in
`=(5xx40)/24` days
`=25/3`
`=8 1/3` days
APPEARS IN
संबंधित प्रश्न
Eight oranges can be bought for Rs. 10.40. How many more can be bought for Rs.16.90?
A family of 5 persons can be maintained for 20 days with Rs.2,480. Find, how long Rs.6944 maintains a family of 8 persons?
The price of 25 identical articles is ₹1,750. Find the price of one article
A motorbike travels 330 km in 5 litres of petrol. How much distance will it cover in 2.5 litres of petrol?
If the cost of a dozen soaps is ₹ 460.80, what will the cost of 15 soaps?
A tree 24 m high casts a shadow of 15 m. At the same time, the length of the shadow casted by some other tree is 6 m. Find the height of the tree.
A loaded truck travels 18 km in 25 minutes. If the speed remains the same, how far can it travel in 5 hours?
Weight of 15 books is 6 kg. What is the weight of 45 such books?
Geeta types 108 words in 6 minutes. How many words would she type in half an hour?
If John walks 250 steps to cover a distance of 200 metres, find the distance covered by him in 350 steps