‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?

विकल्प

  • `3 3/4`

  • `4 3/4`

  • `6 5/6`

  • `7 3/4`

MCQ

उत्तर

`4 3/4`

Explanation:

A, B, and C together can do work in

`=(2xx12xx8xx16)/(12xx8+8xx16+16xx12)`

`=96/13` days

Work is done by all in 3 days`=13/96xx3=39/96`

∴ Remaining work`=1-39/96=57/96`, which is to done by B and C.

∴ B and C can do the remaining work in `57/96xx8`

∴`57/12=4 3/4` days.

shaalaa.com
Time and Work (Entrance Exam)
  क्या इस प्रश्न या उत्तर में कोई त्रुटि है?
2016-2017 (May) Set 1

संबंधित प्रश्न

A tank is connected to three pipes – Pipe A, B, and C. Pipe A can fill the tank in 6 hours,  B can fill the tank in 8 hours and Pipe C can empty the full tank in 12 hours. How much time will it take to fill the tank completely if all three pipes are working together? 


10 men can finish the construction of a hut in 8 days. How many men are needed to finish the same in half a day?


16 men can do a piece of work in 16 days. 4 days after they started the work 8 more men joined them. How many days will they now take to complete the remaining work?


A can do a piece of work in 20 days and B can do the same work in 15 days. How long will they take to finish the work, if both work together?


A group of men decided to do a job in 8 days. But since 10 men dropped out every day, the job got completed at the end of the 12th day. How many men were there at the beginning?


A does 80% of work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?


X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?


P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?


A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in:


A project manager hired 16 men to complete a project in 38 days. However, after 30 days, he realized that only `5/9`th of the work is complete. How many more men does he need to hire to complete the project on time?