English

‘A’ and ‘B’ Complete a Work in 12 Days, ‘B’ and ‘C’ in 8 Days and ‘C’ and ‘A’ in 16 Days. ‘A’ Left After Working for 3 Days. in How Many Days More Will ‘B’ and ‘C’ Finish the Remaining Work? - Mathematics

Advertisements
Advertisements

Question

Choose the most appropriate option

‘A’ and ‘B’ complete a work in 12 days, ‘B’ and ‘C’ in 8 days and ‘C’ and ‘A’ in 16 days. ‘A’ left after working for 3 days. In how many days more will ‘B’ and ‘C’ finish the remaining work?

Options

  • `3 3/4`

  • `4 3/4`

  • `6 5/6`

  • `7 3/4`

MCQ

Solution

`4 3/4`

Explanation:

A, B, and C together can do work in

`=(2xx12xx8xx16)/(12xx8+8xx16+16xx12)`

`=96/13` days

Work is done by all in 3 days`=13/96xx3=39/96`

∴ Remaining work`=1-39/96=57/96`, which is to done by B and C.

∴ B and C can do the remaining work in `57/96xx8`

∴`57/12=4 3/4` days.

shaalaa.com
Time and Work (Entrance Exam)
  Is there an error in this question or solution?
2016-2017 (May) Set 1

RELATED QUESTIONS

A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for ₹ 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?


A, B, and C get  ₹5400 for doing work in 36 days. A and C get ₹1880 for doing the same work in 20 days, which B and C get ₹3040 for doing the same work in 40 days. Find the amount received by C per day.


Pipes P and Q can fill a tank in 5 and 6 h respectively. Pipe R can empty it in 12 h. If all the three pipes are opened together, then the tank will be filled in :


Two pipes P and Q can fill a tank in 15 min and 20 min, respectively. Both the pipes are opened together but after 4 min, pipe P is turned off. What is the total time required to fill the tank?


Ram can do a work in 60 days and the same work Sohan can finish in 40 days. If both of them work together, then in how many days will the work be over?


A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in:


A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 A.M. while machine P is closed at 11 A.M. and the remaining two machines complete work. Approximately at what time will the work (to print one lakh books) be finished?


A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:


Working 8 hours a day, Anu can copy a book in 18 days. How many hours a day should she work so as to finish the work in 12 days?


Anil can do a job in 10 days. Sunn is 40% more efficient than Anil. Find the no. of days required by Sunil to do the same job.


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×