Advertisements
Advertisements
प्रश्न
A and B together can complete a piece of work in 6 days. A can do it alone in 10 days. Find the number of days in which B alone can do the work.
उत्तर
Number of days A takes alone to complete the work = 10 Days.
∴ Amount of work done by A in 1 day = `(1)/(10)`
Let the number of Days B working alone = x
∴ Amount of work done by B in 1 day = `(1)/x`
No of Days they take working together = 6 days
∴ Amount of work done by both in 1 day = `(1)/(6)`
⇒ `(1)/(10) + (1)/x = (1)/(6)`
⇒ `(1)/x = (1)/(6) - (1)/(10)`
= `(5 - 3)/(30)`
= `(2)/(30)`
= `(1)/(15)`
⇒ x = 15 days.
Thus, the number of Days B working alone = 15 days.
APPEARS IN
संबंधित प्रश्न
Solve the following equation:
3(x + 1) = 12 + 4(x - 1)
6b + 40 = – 100 – b
Solve the following equations for the unknown: 15y - 20 = 2y + 6
Solve the following equation for the unknown: `(4x)/(27) = (8)/(9)`
Shweta's age is six times that of Jayeeta's age. 15 years hence Shweta will be three times as old as Jayeeta; find their ages.
The speed of a boat in still water is 8km/h. It takes the same time in going 20km in downstream as it takes in going 12 km upstream. Find the speed of the stream.
The length of a rectangle is 30 more than its breadth. The perimeter of the rectangle is 180 cm. Find the length and breadth of the rectangle.
In a class there are a certain number of seats. If each student occupies one seat, 9 students remain standing and if 2 students occupy one seat, 7 seats are left empty. Find the number of seats in the class.
A man sells an article and makes a profit of 6%. Had he bought the article at a price 4% less and sold at a price higher by Rs 7.60, he would have made a profit of 12%. Find his cost price.
A 12 liter solution is `33(1)/(3)`% acid. How much water must be added to get the solution having 20% acid?