Advertisements
Advertisements
प्रश्न
A contractor undertakes to build a wall 1000 m long in 50 days. He employs 56 men, but at the end of 27 days, he finds that only 448 m of wall is built. How many extra men must the contractor employ so that the wall is completed in time?
उत्तर
Number of men employed in the beginning = 56
Length of wall = 1000 m No. of days = 50
In the time of 27 days, only 448 m of the wall was completed
Remaining period = 50 – 27 = 23 days
and length of wall to be completed = 1000 – 448 = 552
Now in 27 days, 448 m long wall was completed by = 1000 m
in 1 day, 448 m long was completed by = 56 x 27
in 1 day, 1 m long wall will be completed by
`=(56xx27)/448` m
and in 23 days 552 m long wall be completed by
`=(56xx27xx552)/(448xx23)` men
`=(1xx27xx24)/8` = 81 men
∴ No. of extra men required
= 81 − 56 = 25 men
APPEARS IN
संबंधित प्रश्न
If `2/9` of property costs Rs.2,52,000; find the cost of `4/7` of it.
If 10 horses consume 18 bushels in 36 days. How long will 24 bushels last for 30 horses?
If 25 horses consume 18 quintal in 36 days, how long will 28 quintal last for 30 horses?
For ₹ 378, 9 cans of juice can be bought, then how many cans of juice can be bought for ₹ 504?
A motorbike travels 425 km in 5 hours. How much distance will be covered by it in 3.2 hours?
If it has rained 276 cm in the last 3 days, how many cm of rain will fall in one week (7 days)?
Assume that the rain continues to fall at the same rate.
A loaded truck travels 18 km in 25 minutes. If the speed remains the same, how far can it travel in 5 hours?
A made 84 runs in 6 overs and B made 126 runs in 7 overs. Who made more runs per over?
A truck requires 108 litres of diesel for covering a distance of 1188 km. How much diesel will be required by the truck to cover a distance of 3300 km?
25 metres of cloth costs ₹ 1,012.50. What will be the cost of 20 metres of cloth of the same type?