Advertisements
Advertisements
प्रश्न
If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?
उत्तर
70 men dig 15,000 sq. m of a field in 5 days
1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`
Men required to dig 22,500 sq. m. a field in 25 days
`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`
Hence required to dig 22,500 sq. m field in 25 days = 21
APPEARS IN
संबंधित प्रश्न
Eight oranges can be bought for Rs. 10.40. How many more can be bought for Rs.16.90?
Fifteen men can build a wall in 60 days. How many more men are required to build another wall of the same size in 45 days?
A family of 5 persons can be maintained for 20 days with Rs.2,480. Find, how long Rs.6944 maintains a family of 8 persons?
Ten men, working for 6 days of 10 hours each, finish `5/21` of a piece of work. How many men working at the same rate and for the same number of hours each day, will be required to complete the remaining work in 8 days?
If the cost of a dozen identical articles is ₹ 672, what will be the cost of 18 such articles?
A car covers a distance of 180 km in 5 hours. How much distance will the car cover in 3 hours with the same speed?
A car covers a distance of 180 km in 5 hours. How much time will the car take to cover 54 km with the same speed?
Geeta types 108 words in 6 minutes. How many words would she type in half an hour?
A truck requires 108 litres of diesel for covering a distance of 1188 km. How much diesel will be required by the truck to cover a distance of 3300 km?
25 metres of cloth costs ₹ 1,012.50. What will be the cost of 20 metres of cloth of the same type?