If 70 men dig 15,000 sq. m of a field in 5 days, how many men will dig 22,500 sq. m field in 25 days?

बेरीज

उत्तर

70 men dig 15,000 sq. m of a field in 5 days

1 man can dig 15,000 sq. m of a field in =`(5xx70)/ (15,000)`

Men required to dig 22,500 sq. m. a field in 25 days

`=(5xx70xx22500)/(15,000xx25)=(70xx900)/3000=63/3=21`

Hence required to dig 22,500 sq. m field in 25 days = 21