हिंदी

A Moving Object of Mass 30 Kg Has 60 J of Kinetic Energy. What is Its Speed? - Physics

Advertisements
Advertisements

प्रश्न

A moving object of mass 30 kg has 60 J of kinetic energy. What is its speed?
संख्यात्मक

उत्तर

K.E = `1/2` mv²

60 = `1/2` (30) (v)²

or v² = 4 m/s

or v= 2 m/s

shaalaa.com
  क्या इस प्रश्न या उत्तर में कोई त्रुटि है?
अध्याय 1: Force, Work, Energy and Power - Exercise 1.5 i [पृष्ठ ५३]

APPEARS IN

फ्रैंक Physics - Part 2 [English] Class 10 ICSE
अध्याय 1 Force, Work, Energy and Power
Exercise 1.5 i | Q 12 | पृष्ठ ५३

संबंधित प्रश्न

Work is said to be done by a forte only when ................


A vessel containing 50 kg of water is placed at a height 15 m above the ground. Assuming the gravitational potential energy at ground to be zero, what will be the gravitational potential energy of water in the vessel? (g = 10 m s-2)


How much work is done when a force of 1 N moves a body through a distance of 1 m in its own direction?


A boy tries to push a truck parked on the roadside. The truck does not move at all. Another boy pushes a bicycle. The bicycle moves through a certain distance. In which case was the work done more : on the trick or on the bicycle? Give a reason to support your answer.


Name the physical quantity whose SI unit is Nm.


A uniform circular motion is an accelerated motion. Justify it.


Give two examples of work done.


Is kinetic energy a scalar or a vector physical quantity?

Can a body possess zero kinetic energy?

A body of mass 2 kg is moving with a speed of 20 ms-1. What is its K.E.?

Name the parameters that can change the K.E.

A body is pivoted at a point. A force of 10 N is applied at a distance of 30 cm from the pivot. Find the moment of force about the pivot.

A block of mass 20 kg is pulled up a slope (fig.12) with a constant speed by applying a force of 500 N parallel to the slope. A and B are initial and final positions of the block.
(a)    Calculate the work done by the force in moving the block from A and B.
(b)    Calculate the potential energy gained by the block.


Fill in the boxe to show the corresponding energy transformation.


Define Translational motion.


A block of mass 30 kg is pulled up a slope, as shown in diagram with a constant speed, by applying a force of 200 N parallel to slope.
A and B are initial and final positions of block.

(i) Calculate the work done by force in moving the block from A to B.
(ii) Calculate P.E. gained by block. [g=10ms-2]


An electric motor of power 100 W is used to drive the stirrer in a water bath. If 50% of the energy supplied to the motor is spent in stirring the water. Calculate the work done on the water in one minute.


A ______ should act on an object.


Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.

A donkey is carrying a load on its back.


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×