Advertisements
Advertisements
प्रश्न
In a fort 150 men had provisions for 45 days. After 10 days, 25 men left the fort. How long would the food last at the same rate?
उत्तर १
After 10 days:
For 150 men, provision will last (45 − 10)
days = 35 days
⇒ For 1 man, the provisions will last
= 150 × 35 days
And for (150 − 25) = 125 men, the provisions
will last for =`(150xx35)/125`
= 42 days
उत्तर २
Given:
- 150 men have food for 45 days.
- After 10 days, 25 men leave the fort.
- We need to find how long the remaining food will last for 125 men.
The total amount of food is:
Total food = 150⋅45 = 6750 man-days.
Food consumed by 150 men in 10 days is
Food consumed = 150⋅10 = 1500 man-days.
The remaining food after 10 days is
Remaining food = 6750 − 1500 = 5250 man-days.
After 25 men leave, the remaining men are:
Remaining men = 150 − 25 = 125.
The number of days the remaining food will last for 125 men is:
Remaining days = `"Remaining food"/"Remaining men"=5250/125`
= 42 days
APPEARS IN
संबंधित प्रश्न
A train is moving with a uniform speed of 120 km per hour.
(i) How far will it travel in 36 minutes?
(ii) In how much time will it cover 210 km?
36 men can do a piece of work in 7 days. How many men will do the same work in 42 days?
If 56 workers can build a wall in 180 hours, how many workers will be required to do the same work in 70 hours?
Cost of 24 identical articles is Rs. 108, Find the cost of 40 similar articles.
A fort had provisions for 450 soldiers for 40 days. After 10 days, 90 more soldiers come to the fort. Find in how many days will the remaining provisions last at the same rate?
If 12 men or 18 women can complete a piece of work in 7 days, in how many days can 4 men and 8 women complete the same work?
A and B working together can mow a field in 56 days and with the help of C, they could have mowed it in 42 days. How long would C take by himself?
A can do a piece of work in 10 days; B in 18 days; and A, B, and C together in 4 days. In what time would C alone do it?
A and B complete a piece of work in 24 days. B and C do the same work in 36 days; and A, B, and C together finish it in 18 days. In how many days will:
(i) A alone,
(ii) C alone,
(iii) A and C together, complete the work?
P alone can do `1/2` of a work in 6 days and Q alone can do `2/3` of the same work in 4 days. in how many days will they finish `3/4` of the work, working together?