Advertisements
Advertisements
प्रश्न
Three spraying machines working together can finish painting a house in 60 minutes. How long will it take for 5 machines of the same capacity to do the same job?
उत्तर
Let the time taken by 5 spraying machines to finish a painting job be x minutes.
Number of machines | 3 | 5 |
Time (in minutes) | 60 | x |
\[\text{ Since the number of spraying machines and the time taken by them to finish a painting job are in inverse variation, we have } : \]
\[3 \times 60 = 5 \times x\]
\[ \Rightarrow 180 = 5x\]
\[ \Rightarrow x = \frac{180}{5}\]
\[ = 36\]
\[\text{ Thus, the required time will be 36 minutes } .\]
APPEARS IN
संबंधित प्रश्न
A farmer has enough food to feed 20 animals in his cattle for 6 days. How long would the food last if there were 10 more animals in his cattle?
In which of the following table x and y vary inversely:
x | 5 | 20 | 10 | 4 |
y | 20 | 5 | 10 | 25 |
Which of the following quantities vary inversely as other?
Journey (x km) undertaken by a car and the petrol (y litres) consumed by it.
A work force of 50 men with a contractor can finish a piece of work in 5 months. In how many months the same work can be completed by 125 men?
Raghu has enough money to buy 75 machines worth Rs 200 each. How many machines can he buy if he gets a discount of Rs 50 on each machine?
Forty students stay in a hostel. They had food stock for 30 days. If the students are doubled then for how many days the stock will last?
If two quantities p and q vary inversely with each other, then ______
When two quantities x and y are in ______ proportion or vary ______ they are written as `x oo 1/y`.
When two quantities are related in such a manner that if one increases and the other decreases, then they always vary inversely.
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
a | 6 | 8 | q | 25 |
b | 18 | p | 39 | r |