Advertisements
Advertisements
Question
A tank is connected to three pipes – Pipe A, B, and C. Pipe A can fill the tank in 6 hours, B can fill the tank in 8 hours and Pipe C can empty the full tank in 12 hours. How much time will it take to fill the tank completely if all three pipes are working together?
Options
4 hours
4 hours 48 minutes
5 hours
5 hours 20 minutes
Solution
4 hours 48 minutes
Explanation:
A portion of a tank filled in 1 hour, when pipe A, B, and C are working together
`=1/6+1/8-1/12`
`=(4+3-2)/24=5/24` tank
Hence, the time required to fill the tank`=24/5` hours
= 4.8 hours
= 4 hours 48 minutes.
APPEARS IN
RELATED QUESTIONS
Arun can climb a Coconut tree by 1.5 feet by each lift; however, he slips 0.5 feet every time he makes the next lift. How many individual lifts he will have to reach the top of the Coconut tree of 18.5 feet?
Solve the following question and mark the best possible option.
It takes 8 people working at equal rates to finish work in 96 days. How long will 6 workers take to finish the same work?
A group of workers accepted to do a piece of work in 25 days. If 6 of them did not turn up for the work and the remaining workers did the work in 40 days, then the original number of workers was
A contractor Abhay Singh employed some men to do a piece of work which can be done by 16 men in 14 days. At the end of 5 days, 7 of the men stopped working and 3 days later half of the remainder stopped working; the rest finished the work in 5 days. What is the number of men originally employed?
If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same work in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be
Ram can do a work in 60 days and the same work Sohan can finish in 40 days. If both of them work together, then in how many days will the work be over?
P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?
Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?
8 men can finish half of the work in 3 days. If the remaining work is to be completed in 2 days. then the no. of additional men required are?
15 men and 7 women can mow a field in 10 days. In how many days can 30 men and 14 women mow a field thrice as big as the previous one?