Advertisements
Advertisements
प्रश्न
A takes 10 days less than the time taken by B to finish a piece of work. If both A and B together can finish the work in 12 days, find the time taken by B to finish the work.
उत्तर
Let B alone takes x days to finish the work. Then, B’s one day’s work = 1/x.
Similarly, A alone can finish it in (x - 10) days to finish the work. Then, A’s one day’s work `=1/(x-10)`.
It is given that
A’s one day’s work + B’s one day’s work = (A + B)’s one day’s work
`1/x+1/(x-10)=1/12`
`(x-10+x)/(x(x-10))=1/12`
`(2x-10)/(x^2-10x)=1/12`
x2 - 10x = 12(2x - 10)
x2 - 10x = 24x - 120
x2 - 10x - 24x + 120 = 0
x2 - 34x + 120 = 0
x2 - 30x - 4x + 120 = 0
x(x - 30) - 4(x - 30) = 0
(x - 30)(x - 4) = 0
x - 30 = 0
x = 30
Or
x - 4 = 0
x = 4
But x = 4 is not correct.
therefore, x = 30 is correct
Hence, the time taken by B to finish the work in x = 30 days
APPEARS IN
संबंधित प्रश्न
Solve for x : `(x+1)/(x-1)+(x-1)/(x+2)=4-(2x+3)/(x-2);x!=1,-2,2`
Two pipes running together can fill a tank in `11 1/9` minutes. If one pipe takes 5 minutes more than the other to fill the tank separately, find the time in which each pipe would fill the tank separately.
Solve the following quadratic equation for x:
`4sqrt3x^3+5x-2sqrt3=0`
Three years ago, a man was 5 times the age of his son. Four years hence, he will be thrice his son's age. Find the present ages of the man and his son.
Solve equation using factorisation method:
(2x – 3)2 = 49
Solve the equation using the factorisation method:
`(3x -2)/(2x -3) = (3x - 8)/(x + 4)`
In each of the following determine whether the given values are solutions of the equation or not.
6x2 - x - 2 = 0; x = `-(1)/(2), x = (2)/(3)`
Find two consecutive odd integers such that the sum of their squares is 394.
The speed of a boat in still water is 11 km/ hr. It can go 12 km up-stream and return downstream to the original point in 2 hours 45 minutes. Find the speed of the stream
The product of two successive integral multiples of 5 is 300. Then the numbers are: