Advertisements
Advertisements
प्रश्न
Write the given quadratic equation in standard form.
m (m – 6) = 9
उत्तर
m (m – 6) = 9
∴ m2 – 6m = 9
∴ m2 – 6m – 9 = 0
APPEARS IN
संबंधित प्रश्न
Represent the following situation in the form of a quadratic equation.
A train travels a distance of 480 km at a uniform speed. If the speed had been 8 km/h less, then it would have taken 3 hours more to cover the same distance. We need to find the speed of the train.
In the following, determine whether the given values are solutions of the given equation or not:
x2 + x + 1 = 0, x = 0, x = 1
John and Jivanti together have 45 marbles. Both of them lost 5 marbles each, and the product of the number of marbles they now have is 128. Form the quadratic equation to find how many marbles they had to start with, if John had x marbles.
Without solving, comment upon the nature of roots of the following equation:
2x2 + 8x + 9 = 0
Solve `(3x - 2)/(2x - 3) = (3x - 8)/(x + 4)`
Given that 2 is a root of the equation 3x2 – p(x + 1) = 0 and that the equation px2 – qx + 9 = 0 has equal roots, find the values of p and q.
Q - 34
Solve the following equation for x and give, in the following case, your answer correct to 3 decimal places:
3x2 – 12x – 1 = 0
Solve `((3x + 1)/(x + 1)) + ((x + 1)/(3x + 1)) = 5/2`
`sqrt2x^2+7x+5sqrt2=0`
` x^2+6x-(a^2+2a-8)=0`
`((4x-3)/(2x+1))-10((2x+1)/(4x-3))=3,x≠-1/2,3/4`
The product of two consecutive natural numbers which are multiples of 3 is equal to 810. Find the two numbers.
The sum of the square of the 2 consecutive natural numbers is 481. Find the numbers.
A takes 6 days less than the time taken by B to finish a piece of work. If both A and B work together they can finish in 4 days. Find the time taken by B to finish the work.
If 3 and –3 are the solutions of equation ax2 + bx – 9 = 0. Find the values of a and b.
Solve:
`sqrt(x/(x - 3)) + sqrt((x - 3)/x) = 5/2`
3a2x2 + 8abx + 4b2 = 0
The equation 2x2 – 3x + k = 0 is satisfied by x = 2; the value of k is ______.