Six men can complete a work in 12 days. Two days later, 6 more men joined them. How many days will they take to complete the remaining work?
उत्तर
Number of men | No. of days | |
Initially | 6 | 12 |
2 days later available work | 6 | 12 − 2 = 10 |
Remaining work after 6 men joined | 6 + 6 = 12 | x |
As the number of men increases the number of days decreases.
∴ They are inversely proportional
x1y1 = x2y2
6 × 10 = 12 × x
x = `(6 xx 10)/12`
x = 5 days
∴ Remaining work will be complete in 5 days
APPEARS IN
संबंधित प्रश्न
A car takes 2 hours to reach a destination by travelling at the speed of 60 km/h. How long will it take when the car travels at the speed of 80 km/h?
In which of the following table x and y vary inversely:
x | 4 | 3 | 12 | 1 |
y | 6 | 8 | 2 | 24 |
A person has money to buy 25 cycles worth Rs 500 each. How many cycles he will be able to buy if each cycle is costing Rs 125 more?
If x and y vary inversely as other and y = 35, find x when constant of variation = 7.
6 pipes are required to fill a tank in 1 hour 20 minutes. How long will it take if only 5 pipes of the same type are used?
6 pumps are required to fill a water sump in 1 hr 30 minutes. What will be the time taken to fill the sump if one pump is switched off?
When the speed is kept fixed, time and distance vary inversely with each other.
When two quantities are related in such a manner that if one increases and the other decreases, then they always vary inversely.
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
a | l | 9 | n | 6 |
b | 5 | m | 25 | 10 |
The variable x is inversely proportional to y. If x increases by p%, then by what percent will y decrease?