Question
A work force of 50 men with a contractor can finish a piece of work in 5 months. In how many months the same work can be completed by 125 men?
Solution
Let x be the number days required to complete a piece of work by 125 men.
Number of men | 50 | 125 |
Months | 5 | x |
APPEARS IN
RELATED QUESTIONS
A batch of bottles was packed in 25 boxes with 12 bottles in each box. If the same batch is packed using 20 bottles in each box, how many boxes would be filled?
In which of the following table x and y vary inversely:
x | 4 | 3 | 12 | 1 |
y | 6 | 8 | 2 | 24 |
In which of the following table x and y vary inversely:
x | 9 | 24 | 15 | 3 |
y | 8 | 3 | 4 | 25 |
55 cows can graze a field in 16 days. How many cows will graze the same field in 10 days?
If x varies inversely as y, then
x | – | 60 |
y | 2 | 10 |
Length of a side of an equilateral triangle and its perimeter vary inversely with each other.
When two quantities are related in such a manner that if one increases and the other decreases, then they always vary inversely.
If x varies inversely as y and when x = 6, y = 8, then for x = 8 the value of y is 10.
If a deposit of Rs 2,000 earns an interest of Rs 500 in 3 years, how much interest would a deposit of Rs 36,000 earn in 3 years with the same rate of simple interest?