English
Tamil Nadu Board of Secondary EducationHSC Commerce Class 12

Choose the correct alternative: The random variable X is normally distributed with a mean of 70 and a standard deviation of 10. What is the probability that X is between 72 and 84? - Business Mathematics and Statistics

Advertisements
Advertisements

Question

Choose the correct alternative:

The random variable X is normally distributed with a mean of 70 and a standard deviation of 10. What is the probability that X is between 72 and 84?

Options

  • 0.683

  • 0.954

  • 0.271

  • 0.340

MCQ

Solution

0.340

shaalaa.com
Distribution
  Is there an error in this question or solution?
Chapter 7: Probability Distributions - Exercise 7.4 [Page 170]

APPEARS IN

Samacheer Kalvi Business Mathematics and Statistics [English] Class 12 TN Board
Chapter 7 Probability Distributions
Exercise 7.4 | Q 15 | Page 170

RELATED QUESTIONS

In a particular university 40% of the students are having newspaper reading habit. Nine university students are selected to find their views on reading habit. Find the probability that atleast two-third have newspaper reading habit


Defects in yarn manufactured by a local mill can be approximated by a distribution with a mean of 1.2 defects for every 6 metres of length. If lengths of 6 metres are to be inspected, find the probability of less than 2 defects


If the probability of success is 0.09, how many trials are needed to have a probability of atleast one success as 1/3 or more?


Forty percent of business travellers carry a laptop. In a sample of 15 business travelers, what is the probability that 12 of the travelers will not have a laptop?


Determine the binomial distribution for which the mean is 4 and variance 3. Also find P(X=15)


An experiment succeeds twice as often as it fails, what is the probability that in next five trials there will be at least three successes


The distribution of the number of road accidents per day in a city is poisson with mean 4. Find the number of days out of 100 days when there will be atleast 2 accidents 


Time taken by a construction company to construct a flyover is a normal variate with mean 400 labour days and a standard deviation of 100 labour days. If the company promises to construct the flyover in 450 days or less and agree to pay a penalty of ₹ 10,000 for each labour day spent in excess of 450. What is the probability that the company takes at most 500 days to complete the flyover?


Choose the correct alternative:

Using the standard normal table, the sum of the probabilities to the right of z = 2.18 and to the left of z = – 1.75 is


X is a normally distributed variable with mean µ = 30 and standard deviation σ = 4. Find P(30 < X < 35)


Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×