Advertisements
Advertisements
प्रश्न
A work-force of 420 men with a contractor can finish a certain piece of work in 9 months. How many extra men must he employ to complete the job in 7 months?
उत्तर
Let x be the extra number of men employed to complete the job in 7 months.
Number of men | 420 | x |
Months | 9 | 7 |
\[\text{ Since the number of men hired and the time required to finish the piece of work are in inverse variation, we have } : \]
\[420 \times 9 = 7x\]
\[ \Rightarrow x = \frac{420 \times 9}{7}\]
\[ = 540\]
\[\text{ Thus, the number of extra men required to complete the job in 7 months } = 540 - 420 = 120\]
APPEARS IN
संबंधित प्रश्न
A factory required 42 machines to produce a given number of articles in 63 days. How many machines would be required to produce the same number of articles in 54 days?
A car takes 2 hours to reach a destination by travelling at the speed of 60 km/h. How long will it take when the car travels at the speed of 80 km/h?
Which of the following quantities vary inversely as other?
Journey (x km) undertaken by a car and the petrol (y litres) consumed by it.
If x and y vary inversely as other and x = 30, find y when constant of variation = 900.
If x and y vary inversely as other and y = 35, find x when constant of variation = 7.
In a school there is 7 periods a day each of 45 minutes duration. How long each period is if the school has 9 periods a day assuming the number of hours to be the same?
Six men can complete a work in 12 days. Two days later, 6 more men joined them. How many days will they take to complete the remaining work?
If a tree 24 m high casts a shadow of 15 m, then the height of a pole that casts a shadow of 6 m under similar conditions is 9.6 m.
If a and b vary inversely to other, then find the values of p, q, r ; x, y, z and l, m, n.
a | 2 | y | 6 | 10 |
b | x | 12.5 | 15 | z |