Advertisements
Advertisements
Question
Find the mass of a 3.5 m long lead pipe, if the external diameter of the pipe is 2.4 cm, thickness of the metal is 2 mm and the mass of 1 cm3 of lead is 11.4 grams.
Solution
Length of the pipe (h) = 3.5 cm = 300 cm
External radius of the pipe (R) = \[\frac{2 . 4}{2} = 1 . 2 cm\]
Thickness of pipe = 2 mm
= 0.2 cm
So internal radius of pipe = 1.2 - 0.2
= 1cm
Thus volume of pipe `=pi(R^2 - r^2)h`
`=22/7 xx ((1.2)^2 - 1^2) xx 300`
`=22 xx 50 xx 0.44 cm^3`
`=484 cm^3`
Mass of 1 cm3 pipe is 11.4 gm
Total mass = 4184 × 11.4 = 5517.6 gm = 5.518 kg.
APPEARS IN
RELATED QUESTIONS
Water is flowing at the rate of 2.52 km/h through a cylindrical pipe into a cylindrical tank, the radius of whose base is 40 cm. If the increase in the level of water in the tank, in half an hour is 3.15 m, find the internal diameter of the pipe.
A rectangular sheet of paper 40 cm × 22 cm, is rolled to form a hollow cylinder of height 40 cm. The radius of the cylinder (in cm) is ______.
The radius of the base of a right circular cone of semi-vertical angle α is r. Show that its volume is \[\frac{1}{3} \pi r^3\] cot α and curved surface area is πr2 cosec α.
Height of a solid cylinder is 10 cm and diameter 8 cm. Two equal conical hole have been made from its both ends. If the diameter of the holes is 6 cm and height 4 cm, find (i) volume of the cylinder, (ii) volume of one conical hole, (iii) volume of the remaining solid.
A right triangle whose sides are 15 cm and 20 cm (other than hypotenuse), is made to revolve about its hypotenuse. Find the volume and surface area of the double cone so formed. (Choose value of π as found appropriate)
A 5-m-wide cloth is used to make a conical tent of base diameter 14 m and height 24 m. Find the cost of cloth used, at the rate of ₹25 per metre.
The radius (in cm) of the largest right circular cone that can be cut out from a cube of edge 4.2 cm is ______.
A medicine capsule is in the shape of a cylinder of diameter 0.5 cm with a hemisphere tucked at each end. The length of the entire capsule is 2 cm. The capacity of the capsule is
Find the number of solid spheres, each of diameter 6 cm, that could be moulded to form a solid metallic cylinder of height 45 cm and diameter 4 cm.
A cube whose edge is 20 cm long, has circles on each of its faces painted black. What is the total area of the unpainted surface of the cube if the circles are of the largest possible areas?