Advertisements
Advertisements
Question
The cost of an overhaul of an engine is ₹ 10,000 The operating cost per hour is at the rate of 2x – 240 where the engine has run x km. Find out the total cost if the engine runs for 300 hours after overhaul
Solution
Given that the overhaul cost is ₹ 10,000.
The marginal cost is 2x – 240
MC = 2x – 240
C = `int "MC" "d"x + "k"`
C = x2 – 240x + k
k is the overhaul cost
⇒ k = 10,000
So C = x2 – 240x + 10,000
When x = 300 hours, total cost is
C = (300)2 – 240(300) + 10,000
⇒ C = 90,000 – 72000 + 10,000
⇒ C = 28,000
So the total cost of the engine run for 300 hours after the overhaul is ₹ 28,000.
APPEARS IN
RELATED QUESTIONS
The marginal cost function is MC = `300 x^(2/5)` and fixed cost is zero. Find out the total cost and average cost functions
If MR = 14 – 6x + 9x2, Find the demand function
Choose the correct alternative:
The demand and supply functions are given by D(x) = 16 – x2 and S(x) = 2x2 + 4 are under perfect competition, then the equilibrium price x is
Choose the correct alternative:
For the demand function p(x), the elasticity of demand with respect to price is unity then
Choose the correct alternative:
The demand and supply function of a commodity are D(x) = 25 – 2x and S(x) = `(10 + x)/4` then the equilibrium price p0 is
Choose the correct alternative:
If the marginal revenue of a firm is constant, then the demand function is
Choose the correct alternative:
For a demand function p, if `int "dp"/"p" = "k" int ("d"x)/x` then k is equal to
A company has determined that marginal cost function for x product of a particular commodity is given by MC = `125 + 10x - x^2/9`. Where C is the cost of producing x units of the commodity. If the fixed cost is ₹ 250 what is the cost of producing 15 units
The marginal revenue function for a firm given by MR = `2/(x + 3) - (2x)/(x + 3)^2 + 5`. Show that the demand function is P = `(2x)/(x + 3)^2 + 5`
A company requires f(x) number of hours to produce 500 units. It is represented by f(x) = 1800x–0.4. Find out the number of hours required to produce additional 400 units. [(900)0.6 = 59.22, (500)0.6 = 41.63]