X alone can do a piece of work in 6 days and Y alone in 8 days. X and Y undertook the work for ₹ 48000. With the help of Z, they completed the work in 3 days. How much is Z’s share?
उत्तर
X can do the work in 6 days.
X’s 1 day work = `1/6`
X’s share for 1 day = `1/6 xx 48000` = ₹ 8000
X’s share for 3 days = 3 × 8000 = ₹ 24000
Y can complete the work in 8 days.
Y’s 1 day work = `1/8`
Y’s 1 day share = `1/8 xx 48000` = ₹ 6000
Y’s 3 days share = ₹ 6000 × 3 = ₹ 18000
(X + Y)’s 3 days share = ₹ 24000 + ₹ 18000 = ₹ 42000
Remaining money is Z’s share
∴ Z’s share = ₹ 48000 – ₹ 42000 = ₹ 6000
APPEARS IN
संबंधित प्रश्न
36 men can do a piece of work in 7 days. How many men will do the same work in 42 days?
Cost of 24 identical articles is Rs. 108, Find the cost of 40 similar articles.
In order to complete a work in 28 days, 60 men are required. How many men will be required if the same work is to be completed in 40 days?
A garrison has sufficient provisions for 480 men for 12 days. If the number of men is reduced by 160; find how long will the provisions last?
A can-do `1/4` of work in 5 days and B can do `1/3` of the same work in 10 days. Find the number of days in which both working together will complete the work.
A and B can do a work in 8 days; B and C in 12 days, and A and C in 16 days. In what time could they do it, all working together?
A and B complete a piece of work in 24 days. B and C do the same work in 36 days; and A, B, and C together finish it in 18 days. In how many days will:
(i) A alone,
(ii) C alone,
(iii) A and C together, complete the work?
A and B can do a piece of work in 40 days; B and C in 30 days; and C and A in 24 days.
- How long will it take them to do the work together?
- In what time can each finish it working alone?
P and Q can do a piece of work in 12 days and 15 days respectively. P started the work alone and then after 3 days, Q joined him till the work was completed. How long did the work last?
P alone can do `1/2` of a work in 6 days and Q alone can do `2/3` of the same work in 4 days. in how many days will they finish `3/4` of the work, working together?